The structured levers the onboarding generator multiplies. For each trade: its lander, what Sarah extracts, the $ lever, and the money flag (the spec-vs-drawing gotcha that's a change order or a lead-time miss). The next question is composed from persona × size × this row — not hand-written per cell.
| Trade | Sarah extracts | $ lever | Money flag |
|---|---|---|---|
| Electrical/electrical · Electrical OS | devices, fixtures, gear, panel schedules | bid 5 jobs not 2; win TI/healthcare | spec-buried switchgear (40-wk lead) missing on E-sheets |
| Fire Alarm & Security/fire-alarm · Fire Alarm OS | initiating + notification devices, panels, risers | more bids; pass AHJ first time | device spacing / coverage gaps vs code |
| Low Voltage & Data/low-voltage · Low Voltage OS | drops, racks, AP / camera counts, cable | more bids; protect margin | pathway / conduit assumed "by others" |
| Controls & Instrumentation/controls · Controls OS | I/O points, controllers, valves, sensors | points-accurate bids | points-list vs sequence-of-operations gaps |
| Plumbing/plumbing · Plumbing OS | fixtures, water heaters, floor drains, pipe LF | fixture-count speed | med-gas / grease-waste specialty scope |
| Fire Sprinklers/fire-sprinklers · Sprinkler OS | head count, pipe LF, riser / FDC | density-checked bids | hazard classification vs hydraulic calc |
| Doors, Frames & Hardware/doors · Door & Hardware OS | door / frame / hardware-set counts | opening-by-opening accuracy | hardware set vs door schedule + fire rating |
| Specialties (Div 10)/specialties · Specialties OS | partitions, accessories, lockers, signage (ea) | fast each-counts | accessory schedule + ADA mounting gaps |
| Elevators & Lifts/elevators · Elevator OS | units, stops, capacities, speeds | config-accurate bids | pit / overhead / hoistway dimension conflicts |
| Firestopping/firestopping · Firestopping OS | penetrations by UL system, joints | penetration count + UL match | wrong / missing UL-listed system |
| Trade | Sarah extracts | $ lever | Money flag |
|---|---|---|---|
| Drywall & Metal Studs/drywall · Drywall OS | wall area by partition type, track LF, openings | high-volume area bidding | rated-assembly + finish-schedule scope |
| Acoustical Ceilings/ceilings · Ceiling OS | ceiling SF by type, grid, soffits | SF speed | seismic bracing + soffit details |
| Painting & Wallcoverings/painting · Painting OS | wall / ceiling SF, coats, substrates | SF + coats accuracy | special coatings + substrate prep scope |
| Resilient & Soft Flooring/flooring · Flooring OS | floor SF by type, base LF | SF speed | moisture mitigation + floor prep (big $) |
| Tile & Stone/tile · Tile OS | floor / wall SF, setting materials | SF accuracy | wet-area waterproofing + substrate |
| Roofing & Sheet Metal/roofing · Roofing OS | roof SF by system, flashing LF | SF + system match | insulation R-value + warranty assembly |
| Cladding & Wall Panels/cladding · Cladding OS | facade SF by panel type, attachment | SF accuracy | rainscreen / attachment engineering scope |
| Glazing & Storefronts/glazing · Glazing OS | glass / curtainwall SF, openings | SF + openings | glass spec lead-time; structural / thermal |
| Waterproofing & Damp-proofing/waterproofing · Waterproofing OS | below / above-grade SF, detailing LF | SF + detailing | transitions / terminations scope |
| Masonry/masonry · Masonry OS | wall SF, unit count, reinforcing | SF + units | veneer vs structural; anchorage scope |
| Trade | Sarah extracts | $ lever | Money flag |
|---|---|---|---|
| Joint Sealants/sealants · Sealants OS | joint LF by type / width | LF accuracy | sealant compatibility + movement class |
| Rough Carpentry/carpentry · Carpentry OS | blocking / framing LF, sheathing SF | LF / SF accuracy | blocking-not-shown coordination |
| Site Utilities/site-utilities · Site Utilities OS | pipe LF by type, structures (ea), depth | LF + structures | depth / dewatering + utility conflicts |
| Paving & Striping/paving · Paving OS | pavement SF, stripe LF, signage | SF accuracy | subgrade prep + section spec |
| Landscaping & Irrigation/landscaping · Landscape OS | plantings (ea), irrigation LF, area SF | mixed-unit accuracy | plant size / warranty + establishment |
| Site Improvements & Fencing/site-improvements · Sitework OS | fence LF, furnishings (ea), gates | LF + each | gate / access + footing scope |
| Trade | Sarah extracts | $ lever | Money flag |
|---|---|---|---|
| Concrete/concrete · Concrete OS | CY concrete, formwork SF, rebar tons | yardage accuracy + pour schedule | addenda quantity swings; mix-design spec |
| Earthwork & Grading/earthwork · Earthwork OS | cut / fill CY, export, grading SF | earthwork balance | unsuitable soils / rock / dewatering |
| Deep Foundations & Shoring/deep-foundations · Foundations OS | pile LF / ea, shoring SF, CY | production-rate bids | refusal / obstruction + geotech risk |
| Trade | Sarah extracts | $ lever | Money flag |
|---|---|---|---|
| Structural Steel/structural-steel · Steel OS | tonnage, connections, decking SF | tonnage + connections | connection-design + AESS scope |
| Miscellaneous Metals/misc-metals · Misc Metals OS | railings LF, stairs (ea), embeds | each / LF accuracy | deferred-design + shop-drawing scope |
| Trade | Sarah extracts | $ lever | Money flag |
|---|---|---|---|
| Mechanical (HVAC)/mechanical · Mechanical OS | equipment schedule (units), duct LF / lbs, pipe LF | equipment + duct accuracy | equipment lead-time + spec-buried units |
| Millwork & Casework/millwork · Millwork OS | casework LF, countertop SF, items (ea) | LF / SF accuracy | material grade + shop-drawing scope |
| Demolition & Abatement/demolition · Demo OS | demo SF / CY, hazmat scope | SF / CY + hazard scoping | abatement / hazmat survey (liability $) |